A selection of Design and Manufacturing projects carried out by Tribe Engineering Limited:

 

 

Eleclink drill and installation modules (wagon based)

    Clayton Equipment won a contract for the design, manufacture and commissioning of a specialist construction train for use on the prestigious £490m ElecLink project. The new ElecLink electricity connection between Britain and France and will run through the Channel Tunnel between Sellindge in the UK and Les Mandarins in France. It will have the capacity to power up to 2 million homes and provide further resilience for Britain’s electricity supply. Tribe Engineering Limited performed the design standards review…

Loram grinding machine assurance

  Tribe Engineering provided assurance reports for the design of a new build rail grinding machine against EN14033 to support the sale of the machine to a non-European customer.

Clayton Equipment CD40 Crossrail construction locomotive

    Clayton Equipment have designed and built a 40 ton diesel locomotive for use on the construction of the London Crossrail project. This is the worlds first Stage IV diesel loco. Tribe Engineering supported Clayton Equipment with a standards review, design risk assessments and track testing.